WATER RESOURCE DEVELOPEMENT
NAIP aim is to ensure the irrigation water supply to at least 400 families per
cluster. Increased water availability needs to be ensured for at least two crops
in a year. The budget available for this component is Rs. 35 lakhs per cluster,
which includes the costs of measures as well as the training, monitoring and
other overheads related to WRD. ‘Catchment approach’ is to be adopted in
implementation of all WRD activities. For achieving the better impact, selection
of the participants (for horticulture, agriculture) should be contiguous in the
small catchments. For sustainability Pos such as Users’ Groups are to be formed
and strengthened. After completion of Socio-economic survey, technical
surveys will be undertaken. NAIP cluster team will undergo training before
initiating the survey. Training inputs and support for action planning and
activity scheduling are to be sought from Watershed team(BDP/SG). It is
advisable to have two training events–one for districts in Vidarbha and other
for Nagar and Nandurbar. However, the resource team will decide on the
administration of these training(s).
WRD primarily includes construction of check dams, construction and/or repairs of
wells. The water utilization activities include the pumps, water lift
arrangements–pipelines, micro-irrigation systems. ‘Watershed approach’ is to be
adopted in implementation of all WRD activities. For achieving the better
impact, selection of the participants (for horticulture, agriculture) should be
contiguous in the small catchments.
For water resource development (construction/repair of check dams,wells), project
will support 100% material costs and minimum 10% labour should be participants’
contribution. In case of water utilization devises,the in the small groups, at
least 10% of material cost and 100% labour should be contributed by the
participants. The contribution amount will be set aside as maintenance fund in
the bank account of the respective committees at cluster level.
Technologies imparted in the disadvantaged area:
• Temporary Check Dams
• Bodi/improvement in bodi
• Farm bunding
• Farm ponds
• Spring development
• Micro irrigation technologies such as sprinklers
|
|